Location: PSIT, Kanpur
Project Type: (RCC) Rooftop Grid-Tied Solar PV Power Plant
Plant Capacity: 1.24MWp
Scope of Project: Sub-Contract for Installation.
Project Duration: 68 days (with weather challenges)